It offers solutions to the Investors regarding the investments of Hydroelectric Power Plants, Natural Gas Fired Combined Cycle Power Plants, Coal Power Plants, Wind and Solar Power Plants on the following issues.
- Project Preliminary Evaluation
- Concept Design
- Project management
- Contract and Procurement Management
- Budget and Cost Management
- Time management
- trance
TRANŞE
In order to lay the electrical cable infrastructure, the digging of every depth and every type of ground in the width, depth and direction of the approved project by machine or hand, and the loading and unloading of the transportation vehicles required for the removal of the excavation and rubble out of the ditch and their transportation is called TRANŞE.
As Tek Energy, we carry out all kinds of “TRANŞE” operations and transportation of excavation and rubble wastes.
Electrical Infrastructure
Electrical energy needs electrical energy to meet the needs of every home, hospital, workplace and industry to survive. The main reason for power outages is a poorly designed electrical infrastructure. Power systems that provide electricity for a secure electrical infrastructure; It plans to remain active against interruptions in the network. It has a backup (power supply, generator, etc.) It is designed to take into account failures, maintenance and extraordinary situations.