We Show the Right Way to SPP Investors
Our company provides investment consultancy services on solar energy. Regarding the place where you intend to establish a SPP;
- Solar energy potential analysis
- Field, ground and road works
- Examination of the nearest voltage lines
- Determination of suitable places for connection to the electrical grid
- Determination of the settlement point
- Determination of regional and point climate data
- Determination of electricity production
- Determination of electricity consumption
- Making the most appropriate system design
- Equipment selection and design
- Determination of capacity for the system to be installed
- Information about realized projects and references
- Calculation of investment costs
- Presenting investment options
- Floor plan with 3D design
It provides consultancy services on the preparation of comprehensive feasibility for the selected region, suitable for national and international loan applications.
Transformer Tests
Transformer Winding
Our company performs winding and oven drying, maintenance and tests of low voltage – medium voltage coils of distribution transformers between 50 – 2000 KVA.
Transformer Oils and Transformer Oil Treatment
The condition of the oil and the isolation level must be kept under control in order for the transformer to maintain its operational performance in the factory setting. For this reason, oil tests should be done periodically (at least once a year) and insulation levels should be measured.
- Breakdown Voltage (IEC60156-ASTM1816)
- Internal Surface Tension Test (ASTM D971)
- Acidity Test (ASTM D974)
- Loss Factor Test (ASTM D924)
- Water Amount (Moisture) Test ASTM D1533
- Color Determination Test (ASTM D1500)
- Insulation (Megger) Tests of Transformers
- Measuring Winding Turning Ratios of Transformers
Cutter and Separators
- Mechanism repairs of cutters: All repairs in mechanisms are repaired under warranty. Mechanically worn parts are replaced with original parts. The performance of the On-Off Springs is measured. Parts of the mechanisms are lubricated
- Maintenance of cutter tubes
- Insulation tests of vacuum and gas breaker tubes
- Low oil-vacuum and SF6 gas breaker tests
- Time tests of breakers: Opening time, Closing time, Opening-closing time, Closing-opening time, Opening-closing-opening time are performed. Mechanical tests of cutters; Breaker stroke, Ovel travel, Bounce back, Contact wipe, Contact velocity tests are applied
- Contact transition resistance test of poles
Relay
- Over Current Test
- Overcurrent Timed Trip
- Short Circuit Test
- Measuring Short Circuit Trip Time
- Thermal Tripping Test
- Earth Relay Test