About the project

As Tek Enerji, we provide the energy used by BURULAŞ 30 light rail stations with solar power plants installed on the roofs of 30 stations. This project is the first and only build-operate-transfer model in Turkey. Total installed solar power of 30 stations: 2289 kWp. The construction period of the work is 1 year and the operation period is 10 years. At the end of 10 years, the power plant will be transferred to Burulaş

Project Information

Customer: BURULAŞ

Location: Bursa

Year: 2020

Capacity: 30 Metro Station

Build time: 1 Year

Operation Duration: 10 Year

Industry: Transport

Do you want to make a difference in "Renewable Energy"?

TEK Energy is Turkey’s first and only TSE K 473 Certified company in solar power plant manufacturing and installation.

Our Other Projects
Otomatik Panel Yıkama ve Soğutma Sistemleri

Fotovoltaik Hücreler Güneş panelleri, güneş enerjisini elektrik enerjisine dönüştüren fotovoltaik hücrelerden oluşur. Bu hücreler, üzerine düşen fotonlar sayesinde elektrik üretir. Performans Oranı (Performance Ratio / PR) PR, bir GES’in gerçek

Read More >
Enerji Depolama Teknolojileri

Güneş enerjisi yatırımları hızla artarken, bu yatırımların sürdürülebilirliği ve verimliliği açısından enerji depolama çözümleri kritik bir rol üstlenmektedir. Güneş enerjisi doğası gereği kesintili bir kaynaktır; üretim yalnızca güneşin olduğu saatlerde

Read More >
Panel Temizliğinin Önemi

Güneş enerjisi sistemleri, doğru kurulum ve kaliteli ekipman ile uzun yıllar boyunca yüksek performans sunar. Ancak birçok yatırımcı ve kullanıcı tarafından göz ardı edilen kritik bir konu vardır: güneş paneli

Read More >