Our projects About the project As Tek Enerji, we saved 16 thousand 206 trees and prevented 1,446,975 kg of carbon emissions with the 2893.95 kWp capacity Roof Solar Power Plant
As Tek Enerji, we provide the energy used by BURULAŞ 30 light rail stations with solar power plants installed on the roofs of 30 stations. This project is the first and only build-operate-transfer model in Turkey. Total installed solar power of 30 stations: 2289 kWp. The construction period of the work is 1 year and the operation period is 10 years. At the end of 10 years, the power plant will be transferred to Burulaş
Customer: BURULAŞ
Location: Bursa
Year: 2020
Capacity: 30 Metro Station
Build time: 1 Year
Operation Duration: 10 Year
Industry: Transport
TEK Energy is Turkey’s first and only TSE K 473 Certified company in solar power plant manufacturing and installation.
Our projects About the project As Tek Enerji, we saved 16 thousand 206 trees and prevented 1,446,975 kg of carbon emissions with the 2893.95 kWp capacity Roof Solar Power Plant
Our Projects About the project SPP installation on an area of 7,000 square meters belonging to HMK Tekstil was made by our company. Project Information Customer: HMK Textile Location: Bursa