Our Projects

BURULAŞ

About the project

As Tek Enerji, we provide the energy used by BURULAŞ 30 light rail stations with solar power plants installed on the roofs of 30 stations. This project is the first and only build-operate-transfer model in Turkey. Total installed solar power of 30 stations: 2289 kWp. The construction period of the work is 1 year and the operation period is 10 years. At the end of 10 years, the power plant will be transferred to Burulaş

Project Information

Customer: BURULAŞ

Location: Bursa

Year: 2020

Capacity: 30 Metro Station

Build time: 1 Year

Operation Duration: 10 Year

Industry: Transport

Do you want to make a difference in "Renewable Energy"?

TEK Energy is Turkey’s first and only TSE K 473 Certified company in solar power plant manufacturing and installation.

Our Other Projects
Msk Steel

Our projects About the project As Tek Enerji, we saved 16 thousand 206 trees and prevented 1,446,975 kg of carbon emissions with the 2893.95 kWp capacity Roof Solar Power Plant

Read More >
HMK Textile

Our Projects About the project SPP installation on an area of 7,000 square meters belonging to HMK Tekstil was made by our company. Project Information Customer: HMK Textile Location: Bursa

Read More >